Cork Tree Copper Project

The Cork Tree Project is located approximately 830km northeast of Perth in the Doolgunna province within 20km of the Monty project, owned and being developed by Talisman Mining Ltd and Sandfire Resources NL (Sandfire), and 28km from Sandfire’s De Grussa Copper Mine (Figures 1 and 2).  Kalamazoo’s exploration program will explore and test for the potential for copper and other base metal mineralisation at the Cork Tree Prospect.

The Cork Tree Project consists of three granted exploration licences E52/2056, E52/2057 and E52/3042, comprising 50 blocks and covering approximately 155km2.  Kalamazoo is earning in to E52/2056 and E52/2057 under a joint venture with Atlas and has currently completed the Stage 1 Earn-In for a 51% interest.

Figure 1 Location Map of Kalamazoo Projects